top of page
BLATCHINGTON MILL SCHOOL
NEW COMMERCIAL KITCHEN
Following a devastating fire that damaged the whole kitchen area, a new full electrical installation was needed. Initially we carried out a load test to confirm that we had capacity for the new electrical demand. A new three phase distribution circuit was installed, along with three phase distribution board, containment, lighting and power.
-
New LED lighting
-
New circuits for appliances and sockets
-
Ventilation control wiring for extraction and supply fans
-
Gas Interlock system
-
Emergency lighting
-
New three phase distribution board and sub main installation
bottom of page